Godinton House
Commission: Douch Biomass decommissioned an existing boiler system that had become unreliable and was in a poor state of repair. A replacement 400kW wood chip boiler, flue and auger system was installed, with modifications and extensions to the existing heating network. The system now provides heat to the manor house, 7 staff and residential properties, tea rooms, and greenhouses. Douch Biomass then secured the RHI accreditation for the new system.
Boiler Type: HGD M 400kW
Fuel Type: Wood chip
Fuel Storage: Existing silo
CO2 emission reduction: 3400 tonnes
Case History: A delightful Jacobean house set in a 900 acre working estate, which is open to the public as well as schools and educational groups.
Date Completed: September 2015